Manufacturing Plants

FCCL operates four Cement manufacturing plants and a Polypropylene Cement Bag manufacturing plant. These Plants are located at Jhang Bahtar, Nizampur, Wah, Dera Ghazi Khan and Hattar which gives us tremendous opportunity to tap into different high cement demand markets. We are the largest cement supplier to all major hydro power projects in Pakistan, which is a testament to FCCL’s high quality cement and its ability to cater to the specific product needs of such projects. FCCL’s plants feature cutting-edge manufacturing equipment and advanced emission control technologies demonstrating FCCL’s commitment to sustainable growth and environmental responsibility.

Jhang Bahtar

Cement Production Capacity
11,865 MTPD
Key Markets
RWP, AJK, Hazara, Central Punjab
Captive Power
62.3 MW
Thermal Power
16.3 MW
Solar Park
25 MWp
Waste Heat Recovery PP
21 MW

Nizampur

Cement Production Capacity
12,495 MTPD
Key Markets
RWP, AJK, Hazara, Central Punjab
Captive Power
50.2 MW
Solar Park
26.2 MWp
Waste Heat Recovery PP
24 MW

Wah

Cement Production Capacity
3,675 MTPD
Key Markets
KPK, RWP, Central Punjab
Captive Power
16.27 MW
Solar Park
8.77 MWp
Waste Heat Recovery PP
7.5 MW

Dera Ghazi Khan

Cement Production Capacity
6,825 MTPD
Key Markets
South Punjab
Captive Power
21 MW
Solar Park
9 MWp
Waste Heat Recovery PP
12 MW

Polypropylene Bags Plant

PP bags in the manufacturing process at the Hattar Plant, showcasing FCCL’s efficient packaging operations
Production Capacity
6Mn Bags/Month
Captive Power
850 KWp
Solar Power
850 KWp

Sustainable Production

Consistency in Quality means our stringent quality control with numerous initiatives to maintain sustainable production. The production portfolio includes numerous variants of cement for specific infrastructure requirement. Climate conscious construction needs climate friendly building materials therefore we work to innovate and produce environment friendly product and reduce dependency on fossil fuels consumption. The FCCL installed 68 MWp Solar Parks and 65 MW Waste Heat Recovery Plants at Jhang Bahtar, Nizampur, Wah and Dera Ghazi Khan locations to generate and consume clean energy. FCCL has improved its power mix (Renewable 50%) by demonstrating a decrease in purchased electricity and an increase in self-generation from renewable sources (Solar Parks and Waste Heat Recovery Plants). FCCL is taking all the possible mitigation measures to reduce CO2 emissions throughout value-chain activities.

Product Stewardship Policy

Fauji Cement developed and implemented Integrated Management System (IMS) to improve performance and operational excellence. Currently, FCCL is maintaining following ISO standards: –

ISO 9001: 2015 QMS (Quality Management System)

ISO 14001: 2015 EMS (Environmental Management System)

ISO 45001: 2018 OHSMS (Occupational Health & Safety Management System)

ISO 50001:2018 EnMS (Energy Management System)

ISO 14064-1:2018 (GHG Accounting and Verification)

Occupational Safety and Well-being

Occupational health and safety is one of the core values of our business and therefore a fundamental element of our work processes. Our declared aim is zero harm. With effective preventive measures, we intend to reduce the risk of accidents, incidents, and ill health. The health and well-being of our employees, our contractors, and the people in our local communities are at the heart of our actions. We believe that  work-related accidents, occupational diseases, and ill health are generally preventable and that providing a safe working environment is important for maintaining good health and well-being at Fauji Cement.

AI Powered Virtual HR Assistant icon