Fauji Cement Company Limited | Operationalization of Line-II
fauji, cement, company, kse, psx, brand, construction, strong, news, best, updates, top, industry, pakistan, askari, foundation, whr, power, plant, factory, site, ordinary, portland, cement, low, alkali, sulphate, resistant, low, heat, opc, la, lh, src, sales, market, operation, line-II, 2
20131
post-template-default,single,single-post,postid-20131,single-format-standard,ajax_fade,page_not_loaded,boxed,,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-5.4.5,vc_responsive

Material Information / Operationalization of Line-II

Material Information / Operationalization of Line-II

Please be informed that Rehabilitation Work on Line 2 of 7200 TPD has been completed.  Line 2 was made operational on 15th October 2017 and production of clinker commenced on 22nd October 2017 at an enhanced capacity 7600 TPD.